Free introduction to Edgardo
Freelancer No. 15462: Engineer $35/hr • 1969
Brisbane
up to 100 km • 1 intro. since June 2014

Profes­sional back­ground: Bachelors Degree (Materials Engineer), Specialist in Corrosion and Metallic Materials, ESL degree. More than 16 years of experience in gas and oil industry, in Corrosion and Materials Selection, RBI analisys for plant, refinery and Projects. Experience in Cathodic Protection Design in PDVSA, Venezuela. Experience in RBI internal corrosión for Ecopetrol in Colombia. Experience in materials selection for PDVSA and joint ventures of pdvsa with Conoco Phillips, Statoil, Total Fina Oil. Self-employed since 2014.

General qualifications: Microsoft Office ++   Languages: Spanish +++ (Mother Tonge), English ++ (Upper Intermediate/B2)   Miscellaneous: Hourly rate AUD 18 for basic technical consultation, AUD 28 for respond dudes and regular technical consultation, AUD 35 for technical detailed consultation, if colsultation include test or lab analisys the price can change in accordance materials and time.

Explanation: + for low, ++ for medium, +++ for high.


On-site work: Brisbane up to 100 km

Free introduction to Edgardo (#15462): Please fill in this form. You will receive the contractors contact details via email and text within one business day. The introduction is free of charge and does not bind you to to hire the contractor. Please consider that the contractor pays an introduction fee of $70.00 for each genuine introduction.

• Please check that the selected contractor profile fits well to your project.
• You have to agree to the hourly rate ($35.00/hr plus travel expenses).
• You must have an actual project and you are not a professional project broker.
• You can only request one contractor per project.

Free introduction to contractor no. 15462

Client Details

🔒 SSL encryption for secure data transmission.

Project Information

This introduction is made at no charge to the client. It is a mandatory condition of service that the client has a current contract/temporary position available, including budgetary approval, at the time of making the request for introduction to the nominated contractor. Please understand, that in the interest of our contractors, we cannot accept requests from recruitment agencies.

*: Entry required